Our Experience

Location Details of m/c Description of work Completion time
BLA Power Pvt Ltd.Gadarwara (MP) 45 MW X 1 TDPS Siemens Make,Steam Turbine Generator Unloading Installation & Erection on 11 meter height / Siemens make 80 MT Condenser placing upto Height 4.5 meter 22 Days
Tata Steel Kalingana Nagar Odisa 8MW X 5 no. Hyundai Make Engine,315 MVA CGL make Transformer Installation & Erection 4 month
Reliance (Hajira) BHEL make 120 MT Condenser and 240 MT Generator Unloading Installation & Erection on 4.5 meter height 45 days
Steel Authority of India Ltd.(SAIL) Durgapur 110 MT straightening machine Siemens make Erection of 5 meter height 20 days
Mitsubishi Pvt. Ltd.(Haldiya) Crompton Greeves make Transformer 125 MVA Unloading & Erection on plinth 2 days
Rajiv Gandhi International Air port Hyderabad working with GMR office OCTAMECH Engineering Ltd Flight maintenance bay structure unloading shifting assembly and erection 26mtr height Colum and trusses erection total quantity of structure having weight 2011MT including three flight maintenance bay From 19Jan to 16/8/2011 Hand over building
O.N.G.C Manglore Refinery and Petrochemical Ltd Manglor Karnatka State Working with M/s Thermax Ltd Pune 1100MT material handling lob (unloading shifting staging verification, issue record maintain )total center store activity 1 x72 MW Project Total boiler and Turbine related spear unloading and supply to concern contractor (Gas Turbine) From 09April2011 to next 15th month
M/s DuPont India Ltd.Turkapalli A.p PEB Pre Engineered Buildg 740Sq.Mtr area Painting erection shitting,finishing and handover The pre engineered building at Turkapalli Project Total period Three Month
Orient Paper Mill Amlai Dist Shahdol M.P working with Themax India Ltd Pune Siemens make Generator Siemens Make condenser Siemens Make Turbine 1x 25MW and 1 x 30 MW Unloding shifting and lifting up to turbine floor To Four Month
Minakshi Energy Pvt .Ltd.Gudur A.P Working with M/s Thermax India Ltd Pune 150MW x 2 Generator stator China make Stator having 152ton weight shifting up to 80Mtr and lifting up to 11mtr height From 11June2011 to next 26days target
Ind Bharat Power Ltd Tuticorin T.N Working with Greenesol Power Bangulur 150MW x 2 Generator stator China make Stator having 152ton weight shifting up to 80Mtr and lifting up to 11mtr height Till continue
UltraTech cement Ltd. ACW Awarpur cement work dist chandrapur Working with M/s Thermax Ltd.Pune 5000MT material handling job (unloading shifting staging verification, issue record maintain )total center store activity Total boiler and Turbine related spear unloading and supply to concern contractor From April 2010 Total Period of contract 17month
UltraTech cement Ltd. ACW Awarpur cement work dist chandrapur Working with M/s Thermax Ltd.Pune Siemens make 25mw generator having weight 70MT Turbine 20MT Transformer 55MT Unloading shifting and placing up to proper place Generator and turbine lift and shift up to 11mtr height (CFBC boiler) 30days
Siemens make 40mw generator having weight 92MT Turbine 35MT Unloading shifting and placing up to proper place Generator    22days
ACC Cement Guggus Dist Chandrapur M.S Working with M/s Thermax Ltd Pune BHEL make 25Mw Generator and De aerator tank Transformer and BHEL make condenser Unloading shifting and placing up to proper place Generator and turbine lift and shift up to 11mtr height (CFBC boiler) 20Day
UltraTech cement Ltd. ACW Awarpur cement work dist chandrapur Working with M/s Thermax Ltd.Pune Bhart Bijali make Transformer 70MT Unloading shifting and placing up to proper place 5days
UltraTech Cement Hirmi Raipur (C.G.) 6MW Wartsila Make engine with ABB Alternator(120Ton)Air base mounting with one base for alternator 6MW Wartsila Make engine with ABB Alternator(120Ton)Air base mounting with one base for alternator 25Days
Gujarat Fero Chemical Ltd Dehej 6MW Caterpillar make engine (65+25 Tons ) Shifting Dismantling Fabrication loading of all Power Plant Auxiliaries 08Days
Madras cement ltd Govindpuram Ariyalur Tamilnadu working with M/s Thermax Ltd Pune Siemens make 40mw generator having weight 92MT Turbine 35MT condenser 85MT Unloading shifting and placing up to proper place Generator and turbine lift and shift up to 11mtr 26days
Madras cement ltd R R Nagar Madurai Tamilnadu working with M/s Thermax Ltd Pune TDPS make 25mw generator having weight 72MT Siemens make Turbine 35MT Unloading shifting and placing up to proper place Generator and turbine lift and shift up 15days
Vicat Sager Cement (Bharti Cement) Chatrasala Village, Distt Gulbarga TDPS make 35mw generator having weight 72MT Siemens make Turbine 35MT Unloading shifting and placing up to proper place Generator and turbine lift and shift up 15days

Clients

amazon
android
bitly
blogger
dnn
drupal
ebay
facebook
google
ibm

Shree Ganesh Infrastructure

Office:-C-39 Lokmanya Tilak CHS
Rohinipuram, Raipur (C.G)

Branch:-Office: B 303, Tantra Sangam CHS, Plot No.32, Sector-42, Seawood,
Nerul, Navi Mumbai - 400706,